THE UNDERGROUND PLUMBING IS IN!
It might not look like much but we only have two more steps to go through and you will be seeing pictures of the house going up.
Matt is digging the ditch for the water line on a steep hill.

We needed to bring the base up to 5 inches below the top block (exciting huh? this is probably boring some of you but hey, this is our life right now).
James and Matt are dumping dirt in and the rest of us pushed it around with shovels.
We had a bunch of awesome helpers, Matt's sister Mary's kids.
Thanks Joseph, Emily Jimmy and Jared.
Here we are leveling it out to that 5 inch mark.

Here's the Polcyn Bros "working their magic" as Matt said.
Yup, no pictures of me today but I slung a lot of dirt and I'll be sore tomorrow.
That's ok, this way I get to have a tan and nobody else does!

NEXT UP? Laying the insulation for in-the-floor heating.
Labels: house update